[1]
Wahyuli, I. et al. 2023. Perencanaan Perawatan Mesin Electrolytic Tinning Line Menggunakan Metode Risk Based Maintenance. JiTEKH. 11, 1 (May 2023), 10–16. DOI:https://doi.org/10.35447/jitekh.v11i1.694.